Tuesday, March 3, 2026

Odisha: Gate closed after Hirakud dam releases season's first floodwater

Continue reading

August 14, 2019
Odisha Latest

Sambalpur: Hirakud dam authorities closed the sluice gate after releasing season's first floodwater here today.

The gate was shut at 2.00 pm in view of flood-like situation in downstream of Mahanadi River in Odisha.

The floodwater was released from the Hirakud reservoir through No. 7 sluice gate at 11.24 am after the water lever reached 618 ft against storage capacity of 630 ft.

Following the incessant rain in past 24 hours both in upper and lower catchment areas of Mahanadi River, the flood is expected on its banks and its distributaries.

The water level at Alipingal in River Devi may touch or cross the warning level of 10.85 metre by 1.00 am on August 15, informed Executive Engineer, Central Water Commission, Burla.

Similarly, the water level at Naraj is on rise due to heavy rainfall in upper catchment of Mahanadi.

Currently, the water level at Naraj stands at 25.60 metre by 12.00 pm on Wednesday. It may cross the danger mark by 3.00 am on Aug 15.

About the Author
Sambad English Bureau

Sambad English covers latest news and happenings from Odisha from the house of Sambad Group, Eastern Media Limited.

728x90 Advertisement

You May Also Like


DISCLAIMER
All content on this website is the exclusive property of Eastern Media Limited. Any downloadable material, including but not limited to electronic or digital versions of the newspaper (e-paper) in any format, is provided solely for personal use. Unauthorized dissemination, distribution, circulation, or publication of any content or e-paper (whether in PDF or other formats) by any means, including on social media platforms, without prior authorization, permission, or license is strictly prohibited.