Wednesday, March 4, 2026

Trial run conducted on Nayagarh-Mahipur rail line in Odisha

Continue reading

July 25, 2019
Odisha Latest

Nayagarh: The East Coast Railway (ECoR) today conducted a trial run on the 12 km Broad Gauge line from Nayagarh Town to Mahipur railway station, as a part of the 289 km Khurda Road-Balangir rail line project.

A passenger train with bogies rolled on the track between the two stations during the trial run today. Earlier on July 20, only an engine had rolled on the track during the first trial run.

The track is likely to be opened for traffic after a high-level inspection by Commissioner, Railway Safety.

With the newly-built 12 km rail line, the ECoR has already completed 92 km of the Khurda Road-Balangir project. Earlier, 80 km of rail line-- 65.5 km from Khurda Road to Nayagarh Town and 14.5 km from Balangir to Bichhupalli-- were completed.

About the Author
Sambad English Bureau

Sambad English covers latest news and happenings from Odisha from the house of Sambad Group, Eastern Media Limited.

728x90 Advertisement

You May Also Like


DISCLAIMER
All content on this website is the exclusive property of Eastern Media Limited. Any downloadable material, including but not limited to electronic or digital versions of the newspaper (e-paper) in any format, is provided solely for personal use. Unauthorized dissemination, distribution, circulation, or publication of any content or e-paper (whether in PDF or other formats) by any means, including on social media platforms, without prior authorization, permission, or license is strictly prohibited.